Saturday, 2 November 2013

Week 8 Layer of Design Construction

                                                                  Studio Practice 1
                                                 Project layer of Design Construction

The textile and mixed media piece overlaid with a window aperture mount.

 The next stage is finding a good location in the college for the mounted artwork.

Next layer of Design Construction

A layer of copyright music requires a quiet area for the music sound layer.  The presentation of the music sound system will need to be reviewed.


Extended Time Layers of Design Construction
Information passed on by a colleague of extended time plan and visit of Art Co-Ordinator.
Evaluation of Extended time plan
 Considered of redoing text with embroidery but it would not be completed in time beyond the extended deadline. 
Sound Layer of Design Construction
Technicalities of sound module resolved with MP3 and speakers.  The presentation of MP3 and speakers within box layered with muslin.
Presentation Layer of Design Construction
The presentation of mounted artwork with boxed music selected quiet area of college room.  The methods of attaching artwork onto the wall
·         Corner barracks
·         Wing nuts
·         Adhesive tape
PDP
Redirected Study: - Refine Graduation Plan and Power Point Presentation.
Critical & Contextual Studies
Essay Writing Workshop:
Homework for next week: essay plan

Printing Workshop
A treat with a day spend at a printing workshop with silkscreens and textile inks to produce t shirts and tote bags.  Great fun and made a lot of new friends. 
The artist running the course kindly provided websites to purchase the smaller scale silkscreen equipment and materials.   


No comments:

Post a Comment