Studio
Practice 2
Description
This week time plan had been reserved for
the tutor’s request to prepare a final construction template to discuss. The
preparation of the template of the final construction required intensive work.
The issue of safeguarding the
transportation of templates resolved with a large portfolio case. The large
size of the portfolio case eliminated the possibility of carrying other art
materials into college.
Feelings
I had assumed the
Studio Practice 2 Project’s time planned mid module review would be for full
time students
As a part time student I had submitted my
mid Module form and received confirmation from the tutor.A rule of thumb for a part time student is never assume.
Evaluation
The mid module review with the tutor and
my 2 of fellow colleagues presented opportunities to discuss all our
projects. This was a privileged
opportunity to gained insight to their projects and allowed our alternative
viewpoints to explore other options.
It was a privilege to
listen to my talented colleagues show and describe their inspiring projects
David
Gentles - http://www.digart1.blogspot.co.uk/
Stacey
Lockwood - http://www.staceyshariselockwood.blogspot.co.uk/
Conclusion
I will take forward the photographic imagery
acetate overlay with textile image transfer.
Action Plan
Research Presentation ideas
Presentation of textiles
Norma Starszaknowa
Cas Holmes
ordered Connecting Cloth book
Sustainable
practices throughout the project
Construction of Light box for display of final textile artwork acetate
3
D Light box – Inspiration
Trevor
Griffin & Ruth Menzies BAD2 http://www.ruthysprocess.blogspot.co.uk/
- Upcycling free window frames kindly sourced from glazing company – Grahamston Glazing Co Ltd
-
Strip lighting and power
cable
-
Threads
-
Source / Order Stabiliser
- Research :-Random thread mesh fabric/ Coarse Random Weave
- Fire retardant spray - 3D fold paper