Saturday, 9 November 2013

Week 9 - tags

.
Review of project for statement of assessment.   
  The 25 photographic images of red ribbon in Larbert Woodland walk to recognised the 25th anniversity of World Aids Day on 1 December 2013 can be tagged onto social media.  .//www.falkirkcommunitytrust.org/venues/park-gallery/tags-landscape.aspx
This is a small step into the digital world.   A giant leap into social media digital universe needs the assistance of ground control with  social media internet classes.
The alternative social media site of blog world will attempt to put 25 photographic images representing the positive layers of the 25 years support in the community for World Aids Day.
 The blog site may not like having 25 photographic images so this may not end well for me or the blog.  Just as well the project’s nearly finished. 
The Presentation of Artwork Preparations
Presentation attire – Do I wear the World AIDS Day T- shirt?  

















































Saturday, 2 November 2013

9thWeek – the end is near



Sound Box

Studio Practice
The Final artwork is up and ready for presentation.  The title and artist statement is typed up.  The next step will be to attach the title onto foam mount and put the artist statement up beside the final artwork yippee. 



A visit from the NHS Forth Valley Hospital Art Co-ordinator gave an opportunity to discuss where the artwork can be placed in the hospital.  A quiet spot to hear the music near the spiritual care area is ideal place so the music can be heard.
A check of all the PLP, Mid Modules, sketchbooks and blog to assembly and edit for Statement of Assessment revealed the wee glitches with the blog. The last few posts were posted but they seemed to have gone into that internet wildness and landed in drafts.  The joys of technology continue with the facebook as I can’t get access. 
PDP
The report completed for better or worst.  The presentation went well with a good laugh at the end. 
Critical & contextual Studies
The essay plan discussed as a group reveals the heights I will need to reach to achieve a decent grade.  The old grey matter will need to be toned up with a bit of reading. 

Week 8 Layer of Design Construction

                                                                  Studio Practice 1
                                                 Project layer of Design Construction

The textile and mixed media piece overlaid with a window aperture mount.

 The next stage is finding a good location in the college for the mounted artwork.

Next layer of Design Construction

A layer of copyright music requires a quiet area for the music sound layer.  The presentation of the music sound system will need to be reviewed.


Extended Time Layers of Design Construction
Information passed on by a colleague of extended time plan and visit of Art Co-Ordinator.
Evaluation of Extended time plan
 Considered of redoing text with embroidery but it would not be completed in time beyond the extended deadline. 
Sound Layer of Design Construction
Technicalities of sound module resolved with MP3 and speakers.  The presentation of MP3 and speakers within box layered with muslin.
Presentation Layer of Design Construction
The presentation of mounted artwork with boxed music selected quiet area of college room.  The methods of attaching artwork onto the wall
·         Corner barracks
·         Wing nuts
·         Adhesive tape
PDP
Redirected Study: - Refine Graduation Plan and Power Point Presentation.
Critical & Contextual Studies
Essay Writing Workshop:
Homework for next week: essay plan

Printing Workshop
A treat with a day spend at a printing workshop with silkscreens and textile inks to produce t shirts and tote bags.  Great fun and made a lot of new friends. 
The artist running the course kindly provided websites to purchase the smaller scale silkscreen equipment and materials.   


Wednesday, 30 October 2013

Week 7 - Construction of Design in Holiday week

STUDIO PRACTICE 1
                                                    Design Construction during holiday week

The holiday begins with thinking time for mid module feedback. An outing with my friend is always a treat and gives perspective to the project.

Design Construction Ink jet printer transferred photographic image onto freezer paper backed cotton textile. The image transferred cotton has additional layers of:-

 • Coloured muslin applied with bondaweb
 • Red ribbon applied with stitching
• The physicality of hand stitching the poetry text within a short time line required adaptation. Poetry text applied with gutta
• Mount Preparations

The Statement of Assessment form downloaded for final stage of project.

                                                                                 PDP REPORT
The 1st draft report layout requires to be fleshed out.

                                                                        CRITICAL & CONTEXTUAL STUDIOS
 Review recommended reading list.