Wednesday 30 October 2013

Week 7 - Construction of Design in Holiday week

STUDIO PRACTICE 1
                                                    Design Construction during holiday week

The holiday begins with thinking time for mid module feedback. An outing with my friend is always a treat and gives perspective to the project.

Design Construction Ink jet printer transferred photographic image onto freezer paper backed cotton textile. The image transferred cotton has additional layers of:-

 • Coloured muslin applied with bondaweb
 • Red ribbon applied with stitching
• The physicality of hand stitching the poetry text within a short time line required adaptation. Poetry text applied with gutta
• Mount Preparations

The Statement of Assessment form downloaded for final stage of project.

                                                                                 PDP REPORT
The 1st draft report layout requires to be fleshed out.

                                                                        CRITICAL & CONTEXTUAL STUDIOS
 Review recommended reading list.

No comments:

Post a Comment